Case Study

Project: Edinburgh & Midlothian Residential Waste Facility

Location: Edinburgh

VAC have secured there first Efw project in Scotland.

The Millerhil facility near Edinburgh is designed to process a total of 195,000 tonnes per annum of residual municipal and commercial and industrial waste, of which circa 189,471tpa is expected to be transferred to the ERF following the recycling of metals and removal of unsuitable items.

The facility will be capable of exporting up to 11.09 MWe of electricity to the National Grid.

VAC supplied and installed the Vent ductwork systems in both the Admin offices and process areas VAC also supplied and installed the VRF Air Con systems throughout the offices.