Case Study

Project: Mercia EnviRecover Energy From Waste

Location: Worcester

VAC complete another Energy From Waste (Efw) project that’s six sites to date.

The latest project, the Mercia EnviRecover facility has the capacity to treat up to 200,000 tonnes of waste per year, and can produce 15.5 MW of electricity for export to the grid.

VAC supplied and installed the Vent ductwork systems in both the Admin offices and process areas VAC also supplied and installed the VRF Air Con systems throughout the offices.