
CASE STUDIES

PROJECT - PETERBOROUGH CDC
Location - Peterborough
VAC complete another Community Diagnostic Centre (CDC)
Located in the heart of Peterborough, the new CDC will offer a comprehensive range of diagnostic services, including CT, MRI, Dexa, X-ray, Ultrasound, and Fibroscan, alongside cardiology and respiratory diagnostics.
VAC supplied and installed the ventilation ductwork systems throughout the new build.

PROJECT - LYDE GREEN SCHOOL
Location - Bristol
A Passivhaus first!
Lyde Green School, was developed to meet the growing demand for educational facilities arising from significant residential expansion in the area. Constructed using Cross Laminated Timber (CLT), the school is one of the first Passivhaus-accredited educational buildings in the Southwest, demonstrating a strong commitment to sustainability, energy efficiency and occupant wellbeing.
As part of the development, VAC supplied and installed the ventilation ductwork systems throughout the project. Our works supported the building's high-performance requirements, helping to deliver efficient and reliable ventilation solutions that complemented the school's ambitious environmental objectives.
PROJECT - PICKFORD, 125 COLMORE ROW Location - Birmingham
Major High Street bank has an office makeover!
125 Colmore Row comprises 150,000 sq ft of grade A office accommodation spread across nine storeys and also has 66 basement car parking spaces.
As part of the refrub works a new fitness and event spaces, a café with workstations and collaboration spaces were provided.
The order value circa £1m VAC supplied and installed the S&C and the FCU floorplate ventilation ductwork systems connected to new AHU’s on the roof.
PROJECT - HEREFORD COMMUNITY DIAGNOSTIC CENTRE
Location - Hereford
The CDC will bring the latest, state-of-the-art MRI, CT, X-ray and Ultrasound equipment which will allow us to diagnose cancer and other health conditions earlier and with greater accuracy.
As part of the new works VAC supplied and installed the ventilation ductwork systems across two floors including the GF outside AHU.
PROJECT - SHREWSBURY ACADEMY
Location - Shrewsbury
Out with old and in with the new!
As part of the refurbishment works and new STEM block VAC supplied and installed the new classroom and amenity space ventilation ductwork systems.

PROJECT - WATERS
Location - Longbridge nr Birmingham
Waters Corporation opens its new 45,000 square foot manufacturing facility!
Products manufactured at the new site in Longbridge are essential components used in Waters mass spectrometry systems – scientific instruments used by tens of thousands of chemists and analytical scientists worldwide in support of the life, food, environmental, and materials sciences.
VAC supplied and installed Mitsubishi AC systems in the offices and Ventilation ductwork systems throughout the factory space and offices.

PROJECT - ONE CENTENARY WAY Location - Birmingham
Following quickly on the back of One & Two Chamberlain Square VAC secure their third project as part of the Paradise Circus re-development in Birmingham.
One Centenary Way is a new thirteen-storey 280,000sq ft building featuring Grade A office space.As part of the new build VAC will supply and install the S&C and the 4-pipe FCU floorplate ventilation ductwork systems.